Extension Footings Go In

Published by admin in Blog on June 13th, 2011 | No Comments »

On Monday we decided to shutter the footings as there was a strong chance of rain and we didn’t want the footing walls to collapse in on themselves.  We pulled the last length of the trench to finish things off, but things weren’t going to plan.  We kept digging down but we soon started to

(Read More…)

Extension gets Under Way

Published by admin in Blog on June 6th, 2011 | No Comments »

Monday was another bank holiday, so on the Tuesday and the Wednesday Dane and I went about getting the new site set up.  This involved travelling about moving tools and materials, organizing the toilet hire, digger and dumper delivery, contacting Building Control, organizing material prices and deliveries and putting together a proposed work schedule for

(Read More…)

We Start A New Extension

Published by admin in Blog on May 31st, 2011 | No Comments »

After finishing up at Hampton we move on to Alconbury near Huntingdon to start a new single storey extension and garage conversion this week.  So next week the blog will be back up and running on a weekly basis and you can follow the progress of me and Dane, when Dane’s not on Facebook anyway!

Plastering and roof finished, kitchen fitted.

Published by admin in Blog on April 26th, 2011 | No Comments »

I am a little bit behind with my blog at the moment.  I had a weekend away only to return with a tummy bug that had been passed onto me.  So last Monday afternoon after a morning of will I, won’t I be sick, I had to call it a day and spend the afternoon

(Read More…)

Plasterboarding Finished

Published by admin in Blog on April 12th, 2011 | No Comments »

On Monday I had a little trip down to Harlow again to pick up some more of the coloured mortar mix we are using on this current job while Dane continued fixing the new metal stud work system in place in preparation for plaster boarding.  John the brickie was on site on Tuesday to create

(Read More…)

Insulation and plaster boarding

Published by admin in Blog on April 4th, 2011 | No Comments »

Across the week we insulated between the internal roof timbers with Celotex and then put on a cross layer of Celotex.  We then foil taped all the joints and then set about plaster boarding the vaulted ceiling.  Towards the end of the week we started to fix the metal stud work system in the extension

(Read More…)

Extension Roof Goes On

Published by admin in Blog on March 28th, 2011 | No Comments »

Over the last couple of weeks the brick and block work has all been completed and the roof has gone on.  The roof was a cut roof so it was constructed by me and Dane.  The felt baton and tiles have all gone on, as well as the two electric Velux windows that we fitted. 

(Read More…)

Steel Lintels Go In

Published by admin in Blog on March 14th, 2011 | No Comments »

This was the week we put in the two large steel lintels which were going to support the existing house brick and block wall and create the kitchen opening into the extension.  First thing was to get our hands on eight acro props and strong boys plus an alloy tower so we could work safely

(Read More…)

Rain Rain Go Away

Published by admin in Blog on March 7th, 2011 | No Comments »

Unfortunately we lost the first two days of the week to rain, but we were all back on site on the Wednesday, with Andy and Liam continuing with the brick and block work, while Dane and I ran in the rainwater tank hose pipe and connections and also installed the tank pump.  Once that was

(Read More…)

Extension Block Work Goes Up

Published by admin in Blog on February 28th, 2011 | No Comments »

Andy and Liam the brickies were on site on Monday getting themselves set up and making a start by getting the brick and block work up to damp.  While they did that Dane and I took up some of the decking so we could action the last rain water down pipe run from the garage

(Read More…)