Article: Hello New Bathroom

Post    Published: Monday, February 15th, 2010

On the Monday and Tuesday we were back in Peterborough doing some extra work for a client which involved putting me putting in a new insulated stud wall in a bedroom while Stu took out an existing rad, and then replaced an old rad with a new double rad.  John and the J the plasterers then turned up to plaster skim the new wall, and skim over the existing artexed ceiling.

 

On Wednesday we picked up a load of bathroom wall tiles on our way in to work.  The Wednesday and Thursday were just about tiling as the all the walls had to be tiled, plus the new stud work with built in alcoves that we had built, so there were plenty of tile cuts to keep us busy.  On Friday while I continued to tile, Stu set about plumbing in the bath and shower unit, especially as the clients had been without either for nearly two weeks.  Stu got the shower and bath working and although things were not ideal, the clients at least could stay at home and use their facilities instead of the local gyms!



> Leave a Reply